Login

Proposed room layout

The new building (550 Beverley Road, the former HSBC bank) will be integrated into the existing Newland Christian Centre (552 Beverley Road). The changes to the existing Centre will be kept to a minimum, but access will be provided from 550 to 552 by knocking through walls. The existing front door in 550 will be blocked up so we can make the best use of the main room on the ground floor for meetings - entry from Beverley Road to the whole Centre will be through the existing door in 552.

The plans below shows the existing Newland Christian Centre on the left and our newly acquired building on the right, with anticipated usage for the new space and adaptations to 552 to link the two buildings together.

Ground floor


 

First floor of the integrated Centre

 

 

Second floor of the integrated Centre

 

“Unless the Lord builds the house, those who build it labour in vain.”
Psalm 127: 1